             Applied Fluvial Geomorphology

Crosby Brook Phase 1 & 2 Geomorphic Assessments (2007-2008)
During 2007 and 2008 FEA was contracted by the Windham County Natural Resources Conservation District to carry out Phase 1 and 2 geomorphic assessments for a small, urbanizing watershed in Brattleboro, Vermont. Recently collected biotic samples in the watershed indicate that the habitat is impaired by sedimentation and temperature impacts. Data on the physical stability and habitat conditions was collected to understand the sediment dynamics and aid in the identification of projects to restore the biotic integrity of the brook.  Links to posted reports are available here.

Chittenden County Impaired Watersheds (2007-2008)
During 2007 FEA was contracted by the Vermont River Management Program (RMP) to carry out Phase 2 geomorphic assessments within five watersheds in the Burlington area.  In addition, FEA tested the river corridor planning methods developed by RMP within the Potash, Allen and Indian Brook watersheds.  Links to posted reports are available here.

Mad River Headwaters & Corridor Planning (2007-2008)
FEA was contracted by the Friends of the Mad River to carry out Phase 2 geomorphic assessments in the headwaters of the Mad River watershed in Warren. This effort was intended to build on the understanding of the watershed’s fluvial geomorphic processes since the flood of 1998. In addition, FEA and consulting geomorphologist Lisa Godfrey completed a corridor plan for the Mad River in Waitsfield and Warren.  
Links to posted reports are available here.

Town of Colchester Watersheds (2007)
The Chittenden County Regional Planning Commission and the Town of Colchester identified two small watersheds draining to Malletts Bay for geomorphic assessment in 2007. FEA was contracted to carry out the Phase 1 assessments of the Smith Creek and Pond Brook watersheds and make recommendations for future monitoring.  The data will form the basis for future Fluvial Erosion Hazard (FEH) planning in Colchester.

Click HERE for a copy of the final report.

Town of Richmond Tributaries (2007) 
The Chittenden County Regional Planning Commission and the Town of Richmond identified three small tributaries draining to the Winooski River for gemorphic assessment in 2007.  FEA was contracted to carry out the Phase 1 assessments of the tributaries and make recommendations for future monitoring. 
The data will form the basis for future FEH planning in Richmond.

Click HERE for a copy of the final report.

Sucker Brook Assessment, Williston, VT (2007)
The Vermont River Management Program (RMP) and the Town of Williston have worked towards restoration of channel stability in the Sucker Brook Watershed at the site of a large channel avulsion. As part of it's contract with RMP, FEA completed a summary of the watershed geomorphic conditions, including the area above and below the avulsion, as well as the entire main stem channel.

Click HERE for a copy of the final report.


Alder Brook Assessment, Essex, VT (2006)

In 2006 FEA was contracted by the Essex Waterways Association to carry out a Phase 1 & 2 Stream Geomorphic Assessment for the Alder Brook watershed in Essex, Vermont. Increasing urban development in the watershed in recent years has led to concerns about the biotic integrity in the lower watershed. The assessment helped identify areas of increased sediment loading and channel instability due to urban stormwater runoff.

Click HERE for a copy of the final report (without Appendices).

Links to Other Publications by Evan Fitzgerald:

Whitney, D.H., Liner, M.O., Fitzgerald, E.P. (2008). Application of Engineered Wetlands in Stormwater Management. Stormwater, 9(1)

Fitzgerald, E.P.  (2007). Linking Urbanization to Stream Geomorphology and Biotic Integrity in the Lake Champlain Basin, Vermont. MS Thesis, University of Vermont.

Fitzgerald, E.P., McBride, M., Clark, J.S., Hannon, J., Pearce, A., Mouser, P. & Newcomb, D. (2006). Stormwater Treatment on a Shoestring Budget: An AWRA Student Chapter’s Experience. In Proceedings of the 2006 Meeting of the American Water Resources Association. Baltimore, MD

Fitzgerald, E.P. & Bowden, W.B. (2006). Quantifying Increases in Stream Power and Energy Using Flow Duration Curves for Potash Brook, South Burlington, VT. Stormwater, 7(2): 88-94

Fitzgerald, E.P. & Bowden, W.B. (2005). RAN55 -Stormwater BMP Evaluator Tool (Version 1.3). Published on UVM’s Redesigning the American Neighborhood website at:
http://www.uvm.edu/~ran/ran/researchers/ran55.php